Introducing the Premron

Continuous Haulage System

Revolutionary  conveying technology for the Underground Mining industry.

Providing the Underground Mining Industry with safe and continuous product haulage.

The Premron CHS forms an enclosed pouch, shaped as a ‘tear drop’ encapsulating the payload ensuring dust free conveying. This system is used to remove product from the face and transport the payload directly to the Panel Belt, hence removing the requirement for Shuttle Cars.

Conveying technology that can increase your Underground Development rates to at least 8m/hr.

The Premron Continuous Haulage System will provide significant operational advantages within underground coal mines. 

The Premron CHS utilises the Premron Enclosed Belt System (Premron EBS); a FRAS rubber reinforced belt shaped as a tear drop which encloses the payload and ensures dust free conveying.

The Premron CHS system will introduce new levels of productivity, safety and efficiency in gate road development.

The industry advantages for bulk material conveying technology.

Built to strict underground mine compliance, the Premron CHS will withstand extreme conditions whilst delivering a safer and more efficient material handling solution.

  • Increased productivity for reduced costs

  • Reduces delays and increases machine utilisation

  • Development activities can now be done concurrently while you continue mining (NO delay)

  • Enabler to improve roof bolting performance and hence provide further gains (23m/hr possible - unconstrained)

  • Safer and environmentally friendly CHS

Productivity Comparison

Data for a simulation demonstrating the difference in performance between a bolter miner loading into a Premron Continuous Haulage System (CHS) and a shuttle car is displayed in this graph, using a pure process without delays, and accounting for the interdependencies of cutting, loading and bolting processes and coal clearance.

As the face is mined further from the boot end of the fixed belt conveyor, the distance the shuttle car has to travel to discharge its load increases.

Consequently the process rate decreases as mining and bolting operations are delayed while waiting for the shuttle car to return for another load.

Virtual Tour of Typical Mine

Tailored to suit unique and varied mine conditions, the Premron CHS system is a highly configurable design customised for customers specific requirements.

  • Eliminates the wait on shuttle cars

  • Lightweight structures

  • Significant advantage on longwall float productivity rates

  • Ability for Service Vehicles to access along side of conveyor

Contact Premron for a tailored site appraisal and quote (07) 4972 2982 or email us at sales@premron.com.au